The following descriptions relate to construction projects, regulations, and standards. For questions, please contact the Engineering Division.
DESCRIPTION |
PDF format |
General Site Work and Grading |
GE-02a |
Topsoil, Erosion Control, and Utility Coordination |
GE-02b |
Sanitary Sewer |
GE-02c |
Water Main and Paving |
GE-02d |
As-Built Drawing Requirement |
Link |
DESCRIPTION |
PDF format |
Silt Fence |
EC-01 |
Construction Entrance |
EC-02 |
Inlet Protection (Straw Bale Barrier) |
EC-03 |
Inlet Sediment Control Device |
EC-04 |
DESCRIPTION |
PDF format |
Driveways: Non-Residential Approach |
RD-01a |
Driveways: Residential Approach |
RD-01b |
Typical Residential Cul-de-sac |
RD-02 |
Curb Ramps for Sidewalk |
RD-03 |
Depressed Curb: Entrance by Sawing |
RD-04a |
Depressed Curb: Detail |
RD-04b |
Concrete Curb and Gutter |
RD-05a |
Concrete Curb Type B |
RD-05b |
Sidewalk with Integral Curb |
RD-05c |
Pavement Cut and Replacement |
RD-06 |
Temporary Manhole and Curb Ramping |
RD-07 |
Barricade - End of Sidewalk/Path |
RD-08 |
DESCRIPTION |
PDF format |
Street Name Sign |
TR-01 |
Sign Post and Bracket |
TR-02 |
Traffic Control Sign and Post |
TR-03 |
Typical Lane Closure |
TR-04 |
Turning Template Ladder Truck City Design Vehicle |
TR-05 |
Typical Handicap Accessible Parking Stall |
TR-06 |
DESCRIPTION |
PDF format |
Inlet, Type A |
UD-01a |
Catch Basin, Type A |
UD-01b |
Catch Basin, Type C |
UD-01c |
Storm Manhole, Type A |
UD-01d |
Inlet with Concrete Flat Top |
UD-01e |
Curb Inlet Frame and Grate |
UD-02a |
Eccentric Flat Tops for Curb Inlet Storm Manhole |
UD-02b |
Restrictor |
UD-02c |
Flared End Section Precast Concrete Pipe |
UD-02d |
RipRap Details |
UD-02e |
Drywell |
UD-03 |
Sump Pump Connection to Storm Sewer |
UD-04 |
Infiltration Trench |
UD-05 |
Parkway Infiltration Trench |
UD-06 |
DESCRIPTION |
PDF format |
Street and Utility Locations |
UG-01 |
Common Water-Sanitary Sewer Trench |
UG-02 |
Typical Trench Cross Section |
UG-03 |
Water & Sewer Separation Requirements (1 of 2) |
UG-04a |
Water & Sewer Separation Requirements (2 of 2) |
UG-04b |
Water & Sewer Separation Requirements Continued |
UG-04c |
Typical Water & Sanitary Service Lot Location |
UG-05 |
DESCRIPTION |
PDF format |
Sanitary Service Riser - Depth less than 10 feet |
US-01 |
Sanitary Service Riser - Depth greater than or equal to 10 feet |
US-02 |
Existing Sanitary Sewer Saddle Connection |
US-03 |
Standard Sanitary and Monitoring Manhole |
US-04 |
Standard Inside Drop Sanitary Manhole |
US-05 |
Internal External Chimney Seal |
US-06 |
Sanitary-Manhole Doghouse |
US-07 |
DESCRIPTION |
PDF format |
Standard Valve Vault |
UW-01 |
Water Main Pressure Connection |
UW-02 |
Thrust Block Installation |
UW-03 |
Water Service Installation for Ductile Iron Water Main |
UW-04 |
Water Services Installation for PVCO - C909 Water Main |
UW-04A |
Water Valve Jumper |
UW-05 |
Fire Hydrant |
UW-06 |
Chlorination Specification |
UW-08 |
Water Main Test Report |
UW-09A |
Water Main Test Report |
UW-09B |
Water Meter Installation Typical |
UW-10 |
Water Meter Installation with Backflow Preventor |
UW-11 |
PVCO Water Main General Specification |
UW-12 |
PVCO Water Main Tracer Wire General Specification |
UW-13 |
Casing Pipe |
UW-14 |